Repaving and lane striping completed. Bollards have been replaced.

Repaving Along Cycletrack in Munhall

GAP Mile 139 | Reported on | Last Updated:

Contractors have temporarily removed bollards to repave a 0.1 mile section of East Waterfront Drive in Munhall, between Homestead and McKeesport; the new pavement surface is smooth and the “cycletrack” section of the Great Allegheny Passage is marked with new striped lines. At this time, contractors have not replaced bollards on the 0.1 mile stretch. Please take caution when traveling this section.

Share:
Edit Post